2023 Project 1- Replace Two Reserve Engines

Status: In Progress

Category: Public Safety (Fire)

Location: City-wide

Estimated Cost: $1,500,000

Project Description: This project will replace the existing 2007 and 2008 engine apparatuses presently used in a reserve capacity in accordance with guidelines set by NFPA (National Fire Protection Association) for replacement cycles of fire apparatus. Historically, repair costs and downtime of older model vehicles increase significantly as the vehicle's age. The 2007 and 2008 apparatuses will be surplused once new apparatuses are acquired. These new engines will keep Peachtree City's fire fleet in top operating capacity and provide the means to service our citizens and businesses with the best service levels possible.  

Existing Condition:

project 1 2023