2023 Project 23- Path Transition Reconstruction-City Wide

Project Status:

Category: Paths

Location: Citywide

Estimated Cost: $500,000

Project Description: Peachtree City currently has 239 at-grade path system crossings. This project would include a complete inventory and analysis of all at-grade crossings and transitions to roads throughout the city. It would also fund the design of all crossings and transitions to be brought up to current MUTCD standards as well as providing smooth transitions for carts, walkers, and cyclists. This is necessary to provide easy transition for disabled citizens as well as to get path users across crosswalks and into the path system quicker so as not to be in the roadway trying to navigate over a curb. Other considerations to be undertaken with redesigning crosswalk transitions will be proper signage and storm drainage.

Project 23