Project Status:
Category: Paths
Location: Citywide
Estimated Cost: $875,000
Project Description: Peachtree City maintains 36 bridges and 29 tunnels within the multi-use path system. Bridges range from the new Gateway Bridge over Hwy 54 to small stone bridges over creeks. Tunnels range from the two-way concrete tunnels under state highways to the 6'6" high corrugated metal tunnel under Crosstown Drive. The 2017 SPLOST featured a project to fund the ongoing maintenance and upkeep of these capital assets. This has kept our bridges and tunnels both aesthetically pleasing and safe for use. The city is proposing to keep our current inspection and maintenance cycle for these critical city assets by maintaining this project funding for the 2023 SPLOST. The project would include all bridges and tunnels citywide for annual inspections and maintenance work to maintain public safety and the visual appeal of this critical infrastructure.
