News Flash

PTC News Flashes - General

Posted on: April 1, 2021

The 2021 Paving Contract for Peachtree City has Begun

Atlanta Paving and Concrete has started the 2021 Paving Contract for Peachtree City. The contractor will be working within the City’s Right of Way in various subdivisions throughout the City. Many of these subdivisions have concrete/asphalt ramps located in the gutters installed by the homeowners within the City ROW. The contractor has been directed to preserve the curb ramps where possible. If the curb ramps extend into the roadway or are significantly damaged during paving the contractor has been directed to remove the curb ramps. The City nor the Contractor will be responsible for the replacement of damaged/removed curb ramps located in the gutter within the City ROW. Homeowners’ should note that the gutters are designed to direct stormwater runoff. Driveway ramps can cause drainage/stormwater backup issues.

Facebook Twitter Email